A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Measure the line balance during inspection

line balance, supported formats and operating scope · international liquid packaging

Review the line balance around the filling operation. Include container preparation, closure handling and downstream packing in the comparison instead of relying on one speed figure.

01

Measure the line balance during inspection

Record how accumulation, stops and rejects affect a representative run. Check the modules that are actually connected and the time over which output is observed. Keep the conditions with the evidence so different offers can be compared fairly.

02

Verify identity and scope

Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.

03

Inspect condition

Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.

04

Test with evidence

Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.

WhatsApp